Removal and AT installation. Nissan Micra (since 2002 of release)
Service and to Nissan Micra car repairs (since 2002 of release)
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
9.1. General information
9.2. Search of malfunctions
9.3. System of blocking of switching, removal and installation of a cable of blocking
9.4. Removal and installation of assembly of control valves and accumulators
9.5. Adjustment of a cable of the selector
9.6. Removal and PNP sensor installation
9.7. Replacement of the sensor of turns
9.8. Removal and AT installation
9.9. AT repair
10. Power shafts, rotary fists and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes
 







f4fb234a

9-8-snyatie-i-ustanovka-at.html

9.8. Removal and AT installation

Removal

Components of fastening of AT


 PERFORMANCE ORDER

  1. Remove the storage battery (see. The head of System of electric equipment of the engine) and an air line (see. Head of the Power supply system and production of the fulfilled gases).
  2. Remove a hose сапуна and the CKP sensor (see. Undressed the Principle of functioning of a control system of the engine).
  1. Disconnect PNP sensor electroconducting, Ý/m the valve, the VSS sensor and a weight wire.
  1. Remove from AT a selector cable.
  2. Remove forward section of an exhaust pipe (see. Head of the Power supply system and production of the fulfilled gases).
  3. Remove power shafts (see. Head Power shafts, rotary fists and stupichny assemblies).
  4. Remove a hose of a maslookhladitel.
  5. Remove a starter (see. Head of System of electric equipment of the engine).
  6. Remove from the hydrotransformer case a boot (see an illustration Components of fastening of AT).
  7. Turning a cranked shaft, turn out 4 bolts of fastening of a driving disk and the hydrotransformer.
  8. Establish a jack under AT.
  9. Remove an arm of a back support of the engine and the pendular lever, and also turn out bolts of fastening of AT to an arm of the left support of the engine (see. Head Engine).
  10. Establish a jack under the engine.
  11. Turn out bolts of fastening of AT to the engine and remove AT.

Installation

 PERFORMANCE ORDER

  1. Make sure that the distance between the hydrotransformer and an end face of its case makes not less than 21.1 mm.
  1. Establish the hydrotransformer on a driving disk and turn a cranked shaft on some turns to make sure of smoothness of a course of AT.
  1. Tighten bolts of fastening of AT: bolts No. 1 (50 mm) and No. 2 (135 mm) – with effort of 31 ÷ 40 N • m, and bolts No. 3 (20 mm) and No. 4 (30 mm) – with effort of 17 ÷ 23 N • m.

Bolts have different length, do not mix them.

  1. Establish all acting in film components.
  2. After installation adjust a selector cable (see. The section Adjustment of a cable of the selector), modify level of ATF and make sure of absence of its leaks. Check serviceability of work of AT.



9.7. Replacement of the sensor of turns

9.9. AT repair