Removal, installation, dismantling and control unit assembly by ventilation system with a heater and To / Century of Nissan Micra (since 2002 of release)
Service and to Nissan Micra car repairs (since 2002 of release)
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Correction of level of a coolant
5.2.3. Removal, installation, dismantling and control unit assembly by ventilation system with a heater and To/in
5.2.4. Removal, installation, assembly and To/in block dismantling
5.2.5. Removal and installation of a radiator of a heater
5.2.6. Removal and installation of the electromotor of the fan of a heater
5.2.7. Removal and installation of assembly of the resistor of the fan and To/in system sensors
5.2.8. Adjustment of cables of a drive zaslonok
5.2.9. Removal and installation of electromotors of a drive zaslonok
5.2.10. Removal and installation of air lines and deflectors
5.2.11. Removal and installation of lines of a coolant and To/in compressor
5.2.12. Removal and installation of other components of To/in system
5.2.13. Self-diagnostics automatic To/in
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Power shafts, rotary fists and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes
 







f4fb234a

5-2-3-snyatie-ustanovka-razborka-i-sborka-bloka-upravleniya-sistemojj.html

5.2.3. Removal, installation, dismantling and control unit assembly by ventilation system with a heater and To/in

Assembly of the control unit of models without automatic To/in

1 — the Switch of heating of back glass
2 — the To/in Switch
3 — the Handle of the switch of modes of distribution of air
4 — the Handle of a regulator of turns of the fan
5 — the Handle of a regulator of temperature
6 — the Tip of the lever of a drive of a zaslonka of supply of air

7 — the Control unit
8 — an illumination Lamp
9 — the Cable of a drive of a zaslonka of modes
10 — the Cable of a drive of a zaslonka of supply of air
11 — the Cable of a drive of a zaslonka of mixing of air

Control unit assembly with automatic To/in

1 — the Fringing of the switch of modes of distribution of air
2 — a display Fringing
3 — the Fringing of a regulator of temperature
4 — the Overlay of the control unit
5 — the To/in Switch
6 — the Switch of heating of back glass
7 — a temperature Regulator

8 — the Switch of an automatic mode
9 — the Switch of modes of distribution of air
10 — the Regulator of turns of the fan
11 — the Switch of a mode of circulation
12 — the Switch of a mode of forced ventilation
13 — the Control unit

 PERFORMANCE ORDER

  1. Remove facing of the central console (see. Head Body).
  1. On models without automatic To/in remove a tip of the lever of a drive of a zaslonka of supply of air, turn out screws, release clamps and remove the control unit panel. On models with automatic To/in turn out screws, release clamps and remove the control unit. Pass to point 4.

Clamps and screws on models with automatic To/in are located the same, where and on models without it.

  1. Remove drive cables a zaslonok of mixing of air, a mode of distribution of streams and supply of air.
  1. Turn out screws and extend the block from the central console. Disconnect from the block electroconducting and remove it.
  1. If necessary disassemble the control unit according to illustrations Assembly of the control unit of models without automatic To/in and control unit Assembly with automatic К/В.
  2. Installation is made upside-down.



5.2.2. Correction of level of a coolant

5.2.4. Removal, installation, assembly and To/in block dismantling