Removal and installation of the inlet pipeline. Nissan Micra (since 2002 of release)
Service and to Nissan Micra car repairs (since 2002 of release)
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Check of pressure of impellent oil
4.5. Replacement of belts of a drive of auxiliary units and intermediate rollers of belts
4.6. Removal and installation of the inlet pipeline
4.7. Removal and installation of a final collector, catalytic converter and lambda probe
4.8. Removal and installation of the pallet of a case and maslozabornik
4.9. Removal and installation of a cover of a head of cylinders
4.10. Removal, check and installation of camshafts
4.11. Check and adjustment of klapanny gaps
4.12. Removal and installation of a chain of a drive of GRM
4.13. Removal and installation of epiploons of a cranked shaft
4.14. Removal and installation, dismantling and assembly of a head of cylinders
4.15. Removal and installation of the power unit
4.16. Service of the oil pump
4.17. Dismantling and assembly of the block of cylinders
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Power shafts, rotary fists and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes
 







f4fb234a

4-6-snyatie-i-ustanovka-vpusknogo-truboprovoda.html

4.6. Removal and installation of the inlet pipeline

Components of fastening of the inlet pipeline

1 — the Basic arm
2 — Laying

3 — the Hairpin
4 — the Inlet pipeline

 PERFORMANCE ORDER

  1. Remove a sleeve of an air inlet and assembly of covers of an air purifier (see. Section Removal and installation of components of an inlet air path).
  2. Remove PCV hose (between the inlet pipeline and a cover of a head of cylinders) from the inlet pipeline.
  3. Turn out a bolt of fastening of a basic arm (1 on an illustration above).
  4. Give nuts and bolts to sequences, return specified illustrations Sequence of a tightening of fixture of the inlet pipeline.

Sequence of a tightening of fixture of the inlet pipeline

Otdavaniye of a nut No. 5


No. 6 on an illustration at removal of semantic loading does not bear Sequence of a tightening of fixture of the inlet pipeline; the otdavaniye and a tightening of nuts No. 5 and No. 4 can be facilitated, establishing a key in the corresponding dredging (2 on nut No. 5 Otdavaniye's illustration).

  1. Remove the inlet pipeline.
  2. Installation is made upside-down. Pay attention to purity and planeness of interfaced surfaces. Tighten fixture in the sequence designated on an illustration Sequence of a tightening of fixture of the inlet pipeline.

No. 6 on illustrations indicates Sequence of a tightening of fixture of the inlet pipeline a repeated tightening of a bolt No. 1.




4.5. Replacement of belts of a drive of auxiliary units and intermediate rollers of belts

4.7. Removal and installation of a final collector, catalytic converter and lambda probe