Removal and installation of epiploons of a cranked shaft. Nissan Micra (since 2002 of release)
Service and to Nissan Micra car repairs (since 2002 of release)
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Check of pressure of impellent oil
4.5. Replacement of belts of a drive of auxiliary units and intermediate rollers of belts
4.6. Removal and installation of the inlet pipeline
4.7. Removal and installation of a final collector, catalytic converter and lambda probe
4.8. Removal and installation of the pallet of a case and maslozabornik
4.9. Removal and installation of a cover of a head of cylinders
4.10. Removal, check and installation of camshafts
4.11. Check and adjustment of klapanny gaps
4.12. Removal and installation of a chain of a drive of GRM
4.13. Removal and installation of epiploons of a cranked shaft
4.14. Removal and installation, dismantling and assembly of a head of cylinders
4.15. Removal and installation of the power unit
4.16. Service of the oil pump
4.17. Dismantling and assembly of the block of cylinders
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Power shafts, rotary fists and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes
 







f4fb234a

4-13-snyatie-i-ustanovka-salnikov-kolenchatogo-vala.html

4.13. Removal and installation of epiploons of a cranked shaft

 PERFORMANCE ORDER

  1. To replace a forward epiploon it is possible as at the removed forward cover of the block of cylinders (see. The section Removal and installation of a chain of a drive of GRM), and at the established cover.
  2. Remove a pulley of a cranked shaft (see. The section Removal and installation of a chain of a drive of GRM) and by means of a screw-driver take an epiploon from a forward cover.
  1. Grease a new epiploon with impellent oil and press it aflush with an external edge of a forward cover. Use a pipe with external diameter of 50 mm and with internal diameter of 44 mm.

Orientation of an epiploon is specified illustrations above.

  1. Establish acting in film components.
  2. For replacement of a back epiploon of a cranked shaft remove transmission assembly (see. Head Manual box of gear shifting and coupling or Automatic transmission).
  3. On models from RKPP remove a disk and a coupling basket (see. Head Power shafts, rotary fists and stupichny assemblies).
  4. Remove a flywheel or a driving disk (see. Section Service of the oil pump).
  5. Take an epiploon by means of a screw-driver.
  6. Grease a new epiploon with impellent oil and press it by means of a pipe with external diameter of 102 mm and with internal diameter of 90 mm. The epiploon should not act from the case of his holder.
  7. Establish acting in film components.



4.12. Removal and installation of a chain of a drive of GRM

4.14. Removal and installation, dismantling and assembly of a head of cylinders